Microgeneration Installation Standard: MIS 3001

Requirements for contractors undertaking the supply, design, installation, set to work commissioning and handover of solar heating microgeneration systems.

Microgeneration Installation Standard: MIS 3002

Requirements for contractors undertaking the supply, design, installation, set to work commissioning and handover of solar photovoltaic (PV) microgeneration systems.

Microgeneration Installation Standard: MIS 3003

Requirements for contractors undertaking the supply, design, installation, set to work commissioning and handover of micro and small wind turbine systems.

SAP 2005

The Government’s Standard Assessment Procedure for Energy Rating of Dwellings. 2005 Edition.

SAP 2009

The Government’s Standard Assessment Procedure for Energy Rating of Dwellings. 2009 Edition.

FITs Consultation Response and Government Decisions

The document that defines the FiT rules and intended tariff rates.

Finance Act 2007

Sections 20 and 21 cover the rules for income tax exemption for domestic microgeneration.

DECCs GHG Conversion Factors for Company Reporting (2010)

Conversion factors to calculate kWh to kg CO2 for different fuel sources.





Although we make every effort to make sure the documents we hold are the latest and most relevant versions available, the documents on this page may be out of date. The reason we have taken to holding copies of the documents is because the location of the documents keeps changing on the government sites so we can not use links to the primary sources.

We will, in the future, give links to the primary sources of these documents. In the mean time, please feel free to email us at information@rensmart.com if you require links to the primary sources of these documents.